Boeing IDS North Hangar Improvements





This project consists of multiple tasks. Task 1 - Two-story Office Building: A two-story, 17,500-square-foot office building was designed and constructed within the existing high bay hangar. Task 2 – Bay Wall: Construction of an extensive wall to visually separate the open area that previously existed between two hangar bays. Task 3 – Ergo Crib: Remodel of existing office and aircraft manufacturing tool crib. Task 4 – Expansion Study: The firm is currently assisting Boeing in planning a three-bay expansion of the facility.

Next Project


All materials used on this site, including all images, are copyrighted and are protected by copyright laws. They may not be copied, reproduced, modified, published, uploaded, posted, transmitted, or distributed in any way, without GLMV Architecture’s prior written permission.